欧日不卡免费视频_粉嫩高中生自拍视频_亚洲综合激情另类无码专区一_成人午夜黄色激情_少妇人妻精品无码视专页一_观看日韩欧美纯爱电影_少妇高潮太爽了中文字幕三级_在线看免费无码的AV天堂_国产乱人伦av在线a更新_国产乱理伦片在线观

    Service Hotline

    020-38031777-8013

Guangdong Province to carry out "six types of venues, ten will check" special fire safety operations

Release Time:2017-12-15

Guangdong Province to carry out "six types of venues, ten will check" special fire safety operations

    In order to profoundly absorb the big fire accident of "11 · 18" in Daxing District of Beijing and the "11 · 20" fire accident in the southern part of Foshan City in our province and the lesson of "12.9" fire accident in Haifeng County of Shanwei City, Fire prevention and control work, and resolutely prevent and curb the occurrence of deadly fires, Guangdong Province to carry out the province's "six types of premises, ten must check" special fire safety operations.

Action goal
1: Through special operations, we will implement the requirements of fire prevention and control in the winter and spring of this year and focus on the six categories of bulldozers. We will eliminate a number of fire hazards around the ten major links and resolutely prevent and deter dead fires, The death of a group of fire accidents.

Action object ("six categories" place)
2: (a) small stalls.
    (B) "three in one" place.
    (C) group rent.
    (Four) construction project construction site.
    (E) pension service agencies.
    (F) boarding school.



Action content ("ten" will check)
3: (A) installation of leakage protection switch. All types of buildings (places) for electricity lines should be installed leakage protection switch. Switch should use qualified electrical products.
(B) wire casing. All kinds of buildings (places) for electricity supply and electricity lines should be based on national electrical technical standards, to wear metal pipe, closed metal trunking or insulated flame retardant PVC electrical casing protection measures.
(C) emergency escape passage smooth. Various types of buildings (places) should be kept stairways, evacuation routes, safety exit and other emergency escape routes smooth. External walls set anti-theft iron fence will be demolished, living places do need to be installed, should be set to the length and breadth of the net size of not less than 1 meters, 0.8 meters and opening to the emergency exit, and set the slow down, escape ladder auxiliary evacuation facility.
(D) the physical separation of fire sites. Residential places and other production and operation of the premises set by one, the physical wall must be physically separated fire.
(E) illegal residents completely removed. All kinds of buildings (places) shall not violate the rules, and once discovered they must be completely removed.
(Vi) clean up the electric bike. All types of buildings (sites) are prohibited within the illegal parking or charging of electric bicycles, once discovered must be immediately cleaned.
(Seven) demolition of the wooden loft. Various types of buildings (sites) are prohibited from using wood materials to build loft, once discovered that must be forced to remove.
(H) remove flammable materials. All kinds of buildings (places) are prohibited to use interior color plates, polyurethane foam and other flammable materials, once discovered that must be forced to remove.
(Nine) group rented a clear fire management responsibilities. Strict "to reduce group fire risk ten measures" requirement, where the building should be equipped with fire safety chief, director of property services should be served as a business person or lessor as the organization to establish and improve fire safety management system, perform daily fire safety management responsibilities, Implementation of full-time administrator night inspection measures. Accommodation more than 3 places, will install a separate fire alarm detector. Accommodation more than 30 places, all in accordance with the standard installation of automatic fire extinguishing, fire alarm and other fire-fighting facilities, a clear 24-hour staffing implementation of caretakers.
(X) Construction site to implement fire safety and security. In strict accordance with "Construction Engineering Fire Technical Specifications" (GB50720-2011) requirements, establish and improve fire safety management system, a clear person on-site care, temporary firefighting facilities and adequate fire extinguishing equipment, protection of temporary fire water, according to the law implemented Fire operation, to ensure the construction of electricity safety.



Action steps
4: (a) mobilize the deployment phase. All localities have formulated specific plans of action and work schedules in light of the actual situation in the region, and have mobilized their deployment hierarchically to clarify the objectives, tasks and responsibilities of various departments and departments at all levels and to resolve their responsibilities.
(B) investigation and rectification phase.
1. Investigation thoroughly. In accordance with the supervisory division of responsibilities throughout the country, the departments of public security, comprehensive management, housing construction, civil administration, education and public rental housing administrative departments are supervised and supervised by various agencies. Organizers such as grid guards and community police officers are all involved in the investigation. Find out the current situation of the local six types of places and fire safety, establish and improve the list of places and hidden dangers list.
2. Clear division of labor. Carefully sort out the fire hidden dangers existing in six local venues, refer to the principle of grid division, and take construction as the basic unit, clarify the division of responsibilities according to industries and sub-regions, .
3. Concentrate to inform. All cities and counties at county (city, district) level CCS on behalf of fire safety and management of six categories of places such as key people issued a circular letter to inform all kinds of places of fire risk, should take measures to reduce the risk of fire, As well as the legal responsibility that should bear after the fire occurs, urge the responsible persons and managers to voluntarily implement the main responsibility of fire safety and strengthen the fire safety management. Organize focused interviews, conduct fire training, sign a fire safety responsibility, undertaking, supervise the implementation of self-examination and self-correction.
4. Implementation rectification. Based on the actual localities, we should distinguish the types of hidden dangers and rectification requirements, reasonably determine the deadline for rectification of hidden dangers, and implement the hidden danger clearance operation. During the special operation, it is difficult to timely complete rectification. From the perspective of reducing fire risk, various technical and management measures should be implemented in accordance with the established standards in the province to ensure fire safety. We should adhere to the overall principle of "rectifying one batch, shutting down a batch and banning one batch of batches", and use various measures such as punishing and detaining detention for good use, ordering the suspension of production and business operations, water and electricity supply, listing supervision and media exposure, , Classifying and giving full play to the role of public opinion and legal weapons, strengthening the application of the joint disciplinary working mechanism of social integrity system, raising the illegal cost of fire safety and urging social units to implement the main responsibilities of rectification of hidden dangers.
(C) inspection and acceptance stage. The special action to take a hierarchical acceptance mechanism, provincial, city and county (city, district) level 消防委 for the next level people's government work carried out on-site inspection and acceptance, a random number of remediation objects and places for verification, Acceptance results included in the 2017 annual government fire safety assessment results.